Project Includes:
1. Preparation of external fire hydrant GFC drawings
2. Preparation of water sprinkler GFC drawings
3. Preparation of foam sprinkler GFC drawings
4. Preparation of FAS GFC drawings
5. Preparation of fire extinguisher GFC drawings
6. Preparation of MVWS GFC drawings
7. Detailed BOQ preparation
8. Hydraulic calculations of fire hydrant system, water sprinkler systems, foam sprinkler system, MVWS system
8. Preparation of technical specifications
Project includes:
1. Site visit for visual audit of existing fire protection system in Xylo body shop & to understand new requirement of fire protection systems in new logistic area
2. Preparation of design basis report
3. Preparation of sprinkler drawings’
4. Preparation of FAS drawings
5. Preparation of fire extinguisher drawings
6. Preparation of hydraulic calculations of sprinkler system
7. Preparation of BOQ
8. Preparation of project budgetary cost
9. Preparation of technical specifications
10. Technical evaluation of contractor